1. Structural Aluminium Framing & Double‑Glazed Glass Enclosure
Supply and installation of a panoramic glass enclosure using 24 mm double‑glazed units (DGU), comprising 6 mm tempered glass + 12 mm air gap + 6 mm tempered glass. All glass panels will be supplied with black warm‑edge spacers to seamlessly match the aluminium frame color.
- Aluminium Profile: Heavy‑duty, powder‑coated structural aluminum framing.
- Glazing: Premium Double‑Glazed Tempered Glass with Low‑E coating for maximum UV and heat rejection. 6mm + 12mm air spacer + 6mm.
- Main Entrance: Double‑track aluminum sliding door system (2000mm × 2000mm clear opening).
- Hardware: High‑capacity concealed bottom bearing rollers and structural EPDM weather‑stripping for dust/water insulation. All sliding panels equipped with heavy‑duty tandem adjustable rollers (imported: Giesse, Kinlong, or equivalent), rated to support up to 150 kg per panel.
| Item | Qty | Unit Price (AED) | Amount (AED) |
|---|---|---|---|
| Panoramic Glass Enclosure (24mm DGU, Low‑E) | 1 | -- | 25,000 |
Explore our glass solutions for more options.
2. Roofing & Ceiling System
Supply and installation of:
- Outer Layer: 75 mm sandwich panel with PIR insulation, providing excellent waterproofing and heat insulation.
- Inner Layer (Ceiling): Aluminium kick plate or linear baffle ceiling, available in wood finish or solid color options.
- Performance Note: Fully waterproof and humidity‑resistant, unlike gypsum ceiling systems.
- Fan Support: Installation of a concealed 50 × 50 mm steel box section inside the roof cavity to reinforce the ceiling fan hook.
The roof will be constructed using 75 mm sandwich panels with high‑density PIR (polyisocyanurate) insulation to maximize heat rejection and thermal comfort. Below the sandwich panels, a premium aluminium kick plate linear ceiling system will be installed to conceal the roofing sheets and deliver a luxury interior finish.
| Item | Qty | Amount (AED) |
|---|---|---|
| Roofing & Ceiling System (PIR sandwich panel + aluminium ceiling) | L/S | 5,680.00 |
3. Surface Treatment & Waterproofing
Strict corrosion and water ingress prevention protocol.
- Application of anti‑corrosion primer and high‑build PU top coat on all steel elements.
- Sealing of all joints and flashings with structural neutral‑cure silicone.
- Waterproof membrane applied to critical junctions.
| Item | Qty | Amount (AED) |
|---|---|---|
| Surface Treatment & Waterproofing | L/S | 4,700.00 |
Quotation Summary
| Glass Enclosure | 25,000.00 |
| Roofing & Ceiling | 5,680.00 |
| Surface Treatment & Waterproofing | 4,700.00 |
| Total (AED) | 35,380.00 |
|---|
All prices exclude VAT. Valid for 30 days.
Payment Terms
- 50% advance payment to initiate the project
- 30% upon structure delivery to site
- 15% during installation progress
- 5% after completion of work
Cheque payable to WASLEEN TECHNICAL SERVICES L.L.C
Terms & Conditions
- This quotation is valid for 30 days from the date of issue. After this period, prices are subject to review due to fluctuations in global steel and aluminum market rates.
- Not responsible for delivery delays due to payment delays.
Exclusions
- Permits or municipality approvals
- Civil works: any cutting, demolition of existing tiles, or concrete work required to level the floor is the client's responsibility (unless specified).
- The client must provide clear access to the site, electricity, and water for the duration of the installation.
- Any delay caused by restricted access (e.g., security gate passes not ready) will extend the project timeline accordingly.
Warranty
- Structural (10 years): All fabrication works are covered against structural defects under normal usage. Welding and joint integrity under normal load and weather exposure.
- Waterproofing (5 years): Covers leakage from joints and flashings installed by us.
- Warranty is VOID if any third party (e.g., AC technicians, satellite installers) drills into the roof or walls after our handover.
Delivery Time & Completion Guarantee
After receiving the advance payment, within 30–35 days to complete the final installation.
Performance Guarantee: To demonstrate our commitment to this schedule, we agree to a penalty deduction of AED 200 per day for every day the project is delayed beyond the agreed 35‑day period. (Note: Delays caused by Force Majeure, weather conditions, approvals delays, postponed due to legal authority instructions, or changes in scope requested by the client are excluded.)
Quotation Basis & Price Determination
This quotation has been customized exclusively for the specific requirements, scope, designs, drawings, and specifications provided, selected, or approved by the Client. The pricing outlined herein is prepared in good faith based on the information available at the time of issuance and reflects the agreed project parameters.
The total project cost is subject to and directly influenced by material specifications and brand selections, prevailing market prices of materials at the time of procurement, approved installation methodologies, applicable safety and compliance requirements, transportation and logistics processes, as well as skilled and unskilled labor charges. Any variation in these factors may result in a corresponding adjustment to the quoted price.
This quotation is therefore indicative of the approved scope only, and any modifications to designs, materials, execution procedures, site conditions, or regulatory requirements shall be treated as a variation and may impact both the project cost and timeline.
Frequently Asked Questions
1. What is the advantage of double‑glazed glass in the UAE climate?
Double‑glazed units (DGU) with Low‑E coating significantly reduce heat transfer, keeping the interior cool and lowering AC costs. The air gap acts as an insulator, and the tempered glass ensures safety and durability.
2. Can the aluminium frame be customized to match my villa's color?
Yes. All aluminium profiles are powder‑coated in a wide range of RAL colors. You can select any shade to complement your existing architecture.
3. How does the roofing system compare to traditional gypsum ceilings?
The sandwich panel roof with PIR insulation is fully waterproof, humidity‑resistant, and provides superior thermal insulation. Unlike gypsum, it will not sag or discolor over time in outdoor or semi‑outdoor environments.
4. Do you handle municipality approvals in Abu Dhabi?
We assist with the documentation and drawings required for approvals. However, permit fees and any authority‑imposed conditions are typically excluded from the quotation and handled as a variation if needed.
5. What maintenance is required for the glass and aluminium?
Regular cleaning with mild soap and water is sufficient. The powder coating is UV‑stable and should not fade. Inspect seals and drainage annually to ensure optimal performance.
Request a Detailed Quote for Your Project
Every project is unique – contact us for a tailored quotation with full technical specifications and transparent pricing.