1. Flooring Works
Supply and installation of premium flooring throughout the apartment.
- Living / Dining: 800×800 mm porcelain tiles (or engineered wood) – 65 sqm
- Bedrooms: Engineered wood / laminate – 45 sqm
- Kitchen / Bathrooms: Anti‑slip ceramic tiles – 25 sqm
- Skirting: Matching PVC / wooden skirting (100mm height) – 120 lm
- Subfloor preparation: Self‑levelling compound where required
| Item | Area | Unit Price (AED) | Amount (AED) |
|---|---|---|---|
| Porcelain / wood flooring supply & installation | 135 sqm | 180 | 24,300 |
| Skirting installation | 120 lm | 25 | 3,000 |
| Subfloor preparation | 135 sqm | 15 | 2,025 |
2. Painting & Wall Finishes
- Preparation of walls (sanding, filling, priming)
- Two coats of premium matt emulsion (Jotun / Dulux) – walls
- One coat of satin finish for ceilings
- Feature wall with textured paint / wallpaper (optional)
| Item | Area (sqm) | Unit Price (AED) | Amount (AED) |
|---|---|---|---|
| Wall painting (including preparation) | 420 | 22 | 9,240 |
| Ceiling painting | 135 | 18 | 2,430 |
3. Joinery & Custom Cabinetry
- Kitchen cabinets (upper and lower) with quartz countertop – 4.5 lm
- Master bedroom wardrobe (floor‑to‑ceiling, sliding doors) – 3.0 lm
- Second bedroom wardrobe – 2.5 lm
- TV unit / media wall – custom design
- All units: 18 mm MR‑MDF with premium laminate finish, soft‑close hardware
| Item | Qty | Amount (AED) |
|---|---|---|
| Kitchen cabinetry (incl. quartz) | L/S | 18,500 |
| Master wardrobe (3.0m) | 1 | 7,200 |
| Second wardrobe (2.5m) | 1 | 6,000 |
| TV unit / media wall | 1 | 3,800 |
4. MEP Works
- Replacement of all switches and sockets with premium brands (Legrand / Schneider)
- Installation of LED downlights (approx. 30 nos.)
- Additional power and data points as per layout
- Plumbing works for kitchen and bathrooms (replacement of faucets, shower sets, etc.)
| Item | Amount (AED) |
|---|---|
| Electrical works (material + labour) | 12,500 |
| Plumbing works (material + labour) | 6,800 |
Quotation Summary
| Flooring works | 29,325 |
| Painting & wall finishes | 11,670 |
| Joinery & cabinetry | 35,500 |
| MEP works | 19,300 |
| Subtotal | 95,795 |
|---|---|
| VAT (5%) | 4,789.75 |
| Net Total (AED) | 100,584.75 |
All prices include materials and labour as described. Valid for 14 days.
Payment Terms
- 60% advance payment to initiate the project
- 30% upon progress of work
- 10% upon completion of works
Cheque payable to WASLEEN TECHNICAL SERVICES L.L.C
Work may be suspended if payments are delayed. Wasleen is not responsible for delays due to late payments.
Bank Account Details
- Account Name: WASLEEN TECHNICAL SERVICES L.L.C
- Account Number: 0373327089001
- IBAN: AE26 0400 0003 7332 7089 001
- Bank: RAK BANK, AL QUSAIS BRANCH, DUBAI, UAE
Terms & Conditions
- This quotation is valid for 14 days from the date of issue. After this period, prices are subject to review.
- Any variation of the above scope of work will not be covered in this quotation.
- Government fees or approval costs are excluded and shall be borne by the client.
- The client must provide water and electricity at the site for the duration of the works.
- The client is responsible for obtaining any necessary work permits or approvals from authorities.
Exclusions
- Structural alterations or civil works
- Furniture, appliances, or décor items not listed
- External works (balcony, facade)
- Any items not explicitly mentioned in the scope
Quotation Basis & Price Determination
This quotation has been customized exclusively for the specific requirements, scope, designs, drawings, and specifications provided, selected, or approved by the Client. The pricing outlined herein is prepared in good faith based on the information available at the time of issuance and reflects the agreed project parameters.
The total project cost is subject to and directly influenced by material specifications and brand selections, prevailing market prices of materials at the time of procurement, approved installation methodologies, applicable safety and compliance requirements, transportation and logistics processes, as well as skilled and unskilled labor charges. Any variation in these factors may result in a corresponding adjustment to the quoted price.
This quotation is therefore indicative of the approved scope only, and any modifications to designs, materials, execution procedures, site conditions, or regulatory requirements shall be treated as a variation and may impact both the project cost and timeline.
Frequently Asked Questions
1. How long does a full apartment fit‑out typically take?
For an apartment of this size, the estimated duration is 6–8 weeks from advance payment, depending on material availability and site conditions. We provide a detailed schedule at project start.
2. Do you handle all necessary approvals from the building management?
We assist with the documentation and drawings required for building NOCs. However, any fees or charges imposed by the building management are the client's responsibility.
3. Can I choose different materials or brands?
Absolutely. The quotation is based on standard quality materials. You may upgrade or change selections, and the price will be adjusted accordingly.
4. What is not included in the quotation?
Items such as loose furniture, decorative items, air conditioning units (if replacement is needed), and any structural changes are excluded unless specifically mentioned.
5. Do you offer a warranty on the work?
Yes, we provide a 2‑year warranty on all workmanship and 1‑year on electrical/plumbing installations. Manufacturer warranties apply to materials.
Request a Detailed Quote for Your Project
Every project is unique – contact us for a tailored quotation with full technical specifications and transparent pricing.